270 independently explained problems: 54 Municipal, 54 Regional, 105 National Olympiad tasks and 57 Autumn Tournament tasks. Start with the easier tasks and work upwards. Difficulty labels are learning estimates, not official ratings; Group E also includes challenging national-level problems. Years follow Arena’s competition-season labels. Source clarifications are noted on affected tasks.
GROUP E2016 · EasyCeiling division & money

The Cheapest Paint Shop

National Olympiad — Municipal round (2016 season)

Submission name: paint.cpp

Problem summary

Four identical walls have dimensions a by b. Each of three shops sells one type of paint can with a stated coverage and price. Buy enough whole cans from one shop to paint all four walls. Find the minimum total cost.

Input

Three lines with coverage s, price in leva lv and stotinki st; then wall dimensions a b.

Output

The minimum cost as two integers: leva and stotinki.

Constraints

1 ≤ s ≤ 100; 0 ≤ lv ≤ 100; 1 ≤ st ≤ 100; 1 ≤ a, b ≤ 25.

Worked example

An independently prepared example for this explanation.

Input

3 2 80
5 4 20
4 3 50
4 7

Output

96 60

Solution analysis

  1. The required area is four times a × b. A shop covering s square metres per can needs ceiling(area / s) cans, computed exactly as (area + s − 1) / s.
  2. Convert every can price to stotinki using 100 × lv + st. Multiply by the required number of cans and compare the three totals. Convert the minimum back with division and remainder by 100.
  3. The example needs 4 × 4 × 7 = 112 square metres. The three shops require 38, 23 and 28 cans, costing 10640, 9660 and 9800 stotinki. The minimum is therefore 96 leva and 60 stotinki.

Why it works

For each shop, ceiling division is the least whole number of cans with sufficient coverage. All cans have nonnegative price, so this gives that shop’s minimum cost. Comparing all three permitted shops selects the overall minimum, and integer currency conversion preserves its exact value.

Complexity: O(1) time and O(1) space.

Watch out. Do not round the number of cans down. Compare total costs, not price per square metre. Avoid floating-point money.

Commented C++17 solution

An independently written complete program with standard headers.

#include <iostream>
#include <algorithm>
#include <limits>
using namespace std;
int main() {
    ios::sync_with_stdio(false);
    cin.tie(nullptr);
    int coverage[3];
    int price[3];
    for (int i = 0; i < 3; ++i) {
        int leva, stotinki;
        cin >> coverage[i] >> leva >> stotinki;
        price[i] = 100 * leva + stotinki;
    }
    int a, b;
    cin >> a >> b;
    int area = 4 * a * b;
    int best = numeric_limits<int>::max();
    for (int i = 0; i < 3; ++i) {
        // Ceiling division buys the least whole number of cans covering the area.
        int cans = (area + coverage[i] - 1) / coverage[i];
        best = min(best, cans * price[i]);
    }
    cout << best / 100 << ' ' << best % 100 << '\n';
    return 0;
}

Source: Arena Olimpiici ↗